Project

EXTENTION OF VDN

Category

Road infrastructure, Construction Supervision and Project Management

Client

AGEROUTE Sénégal

Location

Dakar, Senegal

Services year

share

EXTENTION OF VDN

Road infrastructure, Construction Supervision and Project Management

VDN (Voie de Dégagement Nord - North Clearance Road) is a stuctural road within traffic management of the capital of Senegal.
This road, with a 2x2 lane profile, presents a total lenght of 38km, with an existing section 18,5km long (from CICES (business center) and Tivaouane Peulh) and a programmed section with a total length of 19,5km (between Tivaouane Peulh and Diamniadio).
This project consists of a PPP, design/built and Operation & Maintenance, with the purpose of extending VDN, with a 2x2 lane profile, to Diamniadio.
The PPP contract will also insure the rehabilitation of existing sections, connection nodes and toll systems.

Provided services

Technical assistance to the government of Senegal during all stages of PPP Project implementation, namely: 
- Traffic studies and preparation of financial model; - Report with evaluation of most suitable PPP model; - Revision of proposals presented by interested private parts; - Preparation of PPP Draft Contract; - Works supervision.